Case Studies

CASE STUDIES

Download case studies (project & product reports) for our products.

RETARDE E

Exposed Aggregate Footpaths:

Exposed Aggregate (McDonalds):

SAME DAY SEALER

Exposed Aggregate Sealing:

EPAR 733

Vehicle Inspection Pit:

EPAR S

Weigh bridge base plates:

Talley's Freezer Floor:

FORTA FERRO

Please visit our dedicated fibre website, www.frc.co.nz

Click here for case studies

FRACURE EMULSION

Lion Nathan East Tamaki:

FRACURE WAX EMULSION

Wiri Inland Port:

KRYSTOL T1/T2

Leaking storage units:

Pond lining:

Pool repair:

Ship factory freezer:

KRYSTOL INTERNAL MEMBRANE

ADHB Carpark:

SILAC

Blockwork Water Repellent:

EXPERIENCE

Being an independent, privately owned company established in New Zealand over 60 years ago, Stratmore Construction Solutions (previously Fraser Brown & Stratmore Limited) has earned a reputation for supplying quality products to the construction industry.

The following selected case studies illustrate some of the different projects that we have been involved with.

Stratmore Construction Solutions Limited has supplied products to many New Zealand projects both large and small, including:

  • Auckland International Airport.
  • Sky Tower, Auckland.
  • The Museum of New Zealand, Wellington.
  • Moa Point Waste Water Treatment Plant, Wellington.
  • WestpacTrust Stadium.
  • Burger King Distribution, Auckland.
  • Various crane rail projects.
  • Dunedin Railway Station refurbishment.
  • Manukau Waste Water Project.
  • Auckland InternationalAirport Runway.
  • Mercury Energy Tunnel (Vector tunnel).
  • Viaduct Basin developments.
  • Northern Gateway Alliance Projects.

ADDITIONAL CASE STUDIES

For additional Kryton Case Studies, please click here.

For additional Forta Ferro Case Studies, please click here.